CASE STUDY HIGHLIGHTS
Custom AHU DESIGN
Based on the gathered measurements and requirements, our engineering team proceeded to design the custom AHUs
AHU Manufacturing
These AHUs were meticulously engineered to meet the exact specifications outlined.
AHU Installation
We developed a detailed installation plan to ensure minimal disruption to the construction activities at Dorset Rise.
Ductwork Integration
Following the successful installation, our team seamlessly integrated the newly installed AHUs into the existing ductwork.
Warner Hotel, Gunton Hall – AHU Manufacturing
Warner Hotel Group are famous for their resort hotels located across the UK. Each is located in a beautiful setting & includes full leisure facilities for guests & usually with a full size indoor swimming pool. To maintain a pool hall at the correct temperature & humidity requires an air-handling unit (AHU) specifically designed for the size of pool & its surroundings.
RELATED CASE STUDIES
TOCA FOOTBALL – 02 ARENA
The Toca Project 02 Dome required refurbishment and repurposing to meet the specific needs of TOCA Social, the world’s first interactive football and dining…
AU VODKA – RED DISTILLERY
The project focused on the refurbishment of the ventilation system at RED Distillery, with a specific emphasis on the extract ventilation for the distillery area.
FOREST OF ARDEN – MARRIOT HOTEL
The project involved the validation and surveying of the Air-Handling Unit (AHU) serving the swimming pool hall. The AHU, installed three years ago, was responsible…