As part of a critical upgrade at a private hospital in Bath, the existing air handling unit (AHU) underwent a full internal refurbishment to improve performance and energy efficiency. The project began with the safe removal of outdated components, followed by modifications to the AHU structure, including the fabrication of new fan bulkheads to support modern equipment. High-efficiency EC supply and extract fans were then installed to enhance airflow control. A custom cubic heat exchanger was manufactured and fitted to optimise heat recovery. The project concluded with full commissioning, system testing, and site cleanup, ensuring the AHU was ready for reliable and efficient operation.

Air handling unit casing exterior at Bath private hospital prior to internal refurbishment

Project Overview

This upgrade formed a key part of the hospital's long-term strategy to reduce its carbon footprint while maintaining high standards of indoor air quality for patients and staff. The installation of EC fan technology and a high-performance heat exchanger not only delivers significant energy savings but also supports improved system reliability with reduced maintenance demands. The collaborative effort between on-site engineers and the BVS team ensured that all works were delivered on time and with minimal disruption to the hospital's day-to-day operations.

What We Did

Old belt-drive fan being removed from operating theatre AHU at Bath private hospital
Removing Previous Fans

Removal of Existing AHU Components

All outdated internal components were carefully stripped out to prepare the unit for refurbishment.

New fan bulkheads and structural metalwork fabricated inside operating theatre AHU, Bath
Modifying AHU Layout

AHU Modifications for New System

The existing AHU layout was reconfigured, including the fabrication of new fan bulkheads and structural metalwork, to accommodate modernised components.

New Ziehl-Abegg EC supply and extract fans installed in operating theatre AHU at Bath private hospital
New EC Extract Fan Wall

Install New Supply & Extract EC Fans

High-efficiency EC fans were installed on both the supply and extract sides, significantly improving airflow control and energy performance.

Custom cubic heat exchanger installed in AHU to maximise heat recovery at Bath private hospital
New Heat Exchanger Cube

Supply & Installation of Heat Exchanger

A new cubic heat exchanger was designed, manufactured, and installed to enhance heat recovery efficiency within the system.

Healthcare AHU Enquiry

Working on a clinical or healthcare AHU project?

We respond within one working day.

Your details

Engineer Insights

Technical guidance from real AHU projects

Occasional updates covering refurbishment strategy, energy reduction, fan upgrades, controls, and HVAC project guidance.