BVS carried out a full frost coil replacement on the Air Handling Unit at a car dealership in Farnborough. The project covered the survey and manufacture of a custom replacement coil, removal of the existing unit and pipework, installation of the new coil, pipework connections, insulation, and final commissioning.

BMW and MINI car dealership exterior in Farnborough where BVS replaced the AHU frost coil

Project Overview

The AHU at the Farnborough car dealership required a full frost coil replacement. BVS managed the complete scope of works from initial survey and coil manufacture through to removal of the old unit, new coil installation, pipework connections, insulation, and commissioning.

What We Did

Fouled and degraded AHU frost coil before replacement at Farnborough car dealership
Survey & Design

Size Up, Design & Manufacture Frost Coil

The existing frost coil was surveyed and sized. A custom replacement was then designed and manufactured to the required specification.

Degraded frost coil removed from AHU at Farnborough car dealership prior to replacement
Removal

Uninstall Heating Coil & Attached Pipework

The existing heating coil and its attached pipework were carefully removed from the AHU, preparing the unit for the new installation.

New frost coil delivered and installed on site at Farnborough car dealership AHU
Installation

Install Replacement Heating Coil

The new replacement heating coil was installed in the AHU, restoring full heating capacity to the air handling unit.

BMW car dealership showroom interior at Farnborough where BVS completed AHU coil replacement works
Pipework & Commissioning

Plumb Up, Insulate & Commission

Associated heating coil pipework was connected and plumbed up, pipework insulation was installed, and the system was commissioned and tested.

Coil Replacement Enquiry

Need an AHU coil replaced at your site?

We respond within one working day.

Your details

Engineer Insights

Technical guidance from real AHU projects

Occasional updates covering refurbishment strategy, energy reduction, fan upgrades, controls, and HVAC project guidance.