Pembroke Offices
AHU Refurbishment

Download PDF

50 Pembroke Court, located approximately 35 miles southeast of London, provides flexible open-plan office space with excellent connectivity to London stations and the Channel Ports. Following a comprehensive front-of-house refurbishment, the building required an upgrade to its AHUs to enhance the efficiency and performance of its HVAC system. The project aimed to ensure optimal air quality and comfort for its tenants, aligning with the modernised aesthetic and functionality of the newly refurbished front-of-house areas.

50 Pembroke Court office building exterior prior to AHU refurbishment works

Project Overview

This case study outlines the completed AHU refurbishment, detailing the specific upgrades and improvements made to both the supply and extract units within the rooftop plantrooms. Internal patching of the AHU casing was performed as required throughout, with any rusted areas treated with red oxide primer.

What We Did

New reverse cycle coil installed with copper pipework inside AHU at Pembroke Offices
Reverse Cycle Coil Replacement

Full Coil Removal & Replacement

All AHU-mounted coils, including the frost coil, heating coil, run around coil, and cooling coil, were removed. A new reverse cycle coil was installed in place of the removed coils.

Engineer working on AHU refurbishment at Pembroke Offices rooftop plantroom
Supply Fan & Motor Replacement

New Ziehl EC Fan Bulkhead

The existing belt-driven supply fan and motor were removed. A new fan bulkhead was supplied and fitted with three Ziehl EC fans. Fan power cables were wired to an isolator switch, and the controls were wired to a potentiometer.

New electric heater battery installed inside AHU duct section at Pembroke Offices
Electric Heater Battery Replacement

84kW EHB Installation

A new free-issued Electric Heater Battery (EHB) was installed, consisting of two 42kW EHBs to provide a total of 84kW heating capacity. All necessary metalwork to fabricate the EHB duct heater section was supplied and installed. Wiring was handled by other contractors.

New blue filters installed in AHU filter bulkhead at Pembroke Offices
Filter Bulkhead & Inlet Damper

Freeze Protection & Filter Monitoring

A new filter bulkhead was introduced to prevent any risk of freezing in the system during colder months. An inlet damper was installed for better monitoring of filter status, helping maintain air cleanliness and reducing maintenance costs.

Office AHU Enquiry

Planning an AHU refurbishment for a commercial office?

We respond within one working day.

Your details

Engineer Insights

Technical guidance from real AHU projects

Occasional updates covering refurbishment strategy, energy reduction, fan upgrades, controls, and HVAC project guidance.