Case Study · Manufacturing · AHU Refurbishment
AU Vodka / RED Distillery
AHU Manufacturing, Refurbishment & Installation
The project focused on the refurbishment of the ventilation system at RED Distillery, with a specific emphasis on the extract ventilation for the distillery area. The scope of work included the design and installation of a new extract system, spiral ductwork, fire dampers, and an extract fan. The system was designed to achieve 6 air changes per hour within the distillery area.
The AHU refurbishment and installation of the ventilation system at RED Distillery aimed to enhance air quality and maintain optimal working conditions within the distillery area. The project encompassed design, installation, and commissioning, ensuring compliance with regulations and client requirements.

Project Overview
The project had a tight completion deadline due to the Christmas shutdown. To meet the schedule, it was necessary to order materials by a specific date to ensure their availability. The project adhered to building regulations, client requirements, and recommendations, and emphasised the importance of health and safety compliance, including the provision of method statements, risk assessments, and appropriate personal protective equipment.
What We Did

Extract System Design
The design of the extract system ensured that the distillery area achieved the required air changes per hour, maintaining proper ventilation and air quality.

System Components
The project involved the installation of spiral ductwork, fire dampers, and an extract fan, ensuring efficient and effective ventilation within the distillery area.

Speed Controller Installation
The proposal included the option to provide and install a speed controller for the extract fan, offering control over the air extraction process.