The Toca Project O2 Dome required refurbishment and repurposing to meet the specific needs of TOCA Social, the world's first interactive football and dining experience. The existing Air-Handling Unit (AHU) did not meet the requirements, necessitating the repurposing of the AHU to accommodate the required air volume for the activity area and bar.

The survey focused on AHU 1, 2, and 3, evaluating options for refurbishment and reinstating them to their original designs or reducing their duties while refurbishing. AHU 1 and 2 were assessed for potential refurbishment and increasing their duty to the maximum capacity, while AHU 3 required refurbishment and maintenance of its current duty.

TOCA Social venue interior at the O2 Arena, London

Project Overview

We fully refurbished all AHU units on time to the client's satisfaction, now fit for another 20-30 years of life.

What We Did

BVS engineers carrying out AHU survey and refurbishment works at the O2 Arena, London
AHU Survey & Refurbishment

Comprehensive Survey

A thorough survey of multiple AHUs allowed for targeted solutions, identifying specific issues such as leaking coil pipework, damaged frost coil, and corroded areas.

Player using the TOCA Social football simulator at the O2 Arena, London
TOCA Social Activity Area

Customised Repurposing

The AHU refurbishment and maintenance project was tailored to TOCA Social's specific needs, ensuring the units were modified to provide the required air volume for the activity area and bar.

Upper level interior of TOCA Social venue at the O2 Arena, London
Venue Interior

Efficient and Economical Solutions

Cost-effective refurbishment measures were implemented, including treating corrosion, replacing seals and filters, and cleaning components. Proper alignment and tensioning of fan motor drives maximised the efficiency and lifespan of the AHUs.

AHU Refurbishment Enquiry

AHU refurbishment needed at your venue?

We respond within one working day.

Your details

Engineer Insights

Technical guidance from real AHU projects