CASE STUDY HIGHLIGHTS

b

COMPREHENSIVE ASSESSMENT

The survey encompassed a thorough examination of various components

p

Troubleshooting

Conducting research to identify any underlying problems or malfunctions in the AHUs.

Performance optimisation

Ensure everything is running efficiently & contributing to optimal overall performance.

Equipment Refurbishment

AHUs were found to be in reasonable condition and deemed suitable for refurbishment

Indoor swimming pool at the Forest of Arden Marriott hotel.

Forest of Arden Case Study

The project involved the validation and surveying of the Air-Handling Unit (AHU) serving the swimming pool hall. The AHU, installed three years ago, was responsible for supplying and extracting air to maintain a temperature of approximately 31°C. However, the client reported that the maximum temperature achieved since the installation of the AHU was only around 21°C. The investigation covered various aspects of the installation, including air volumes, temperatures, ductwork layout, and air distribution system.

RELATED CASE STUDIES

SOUTHAMPTON UNIVERSITY

We can survey your existing equipment and from this produce a condition report with recommendations to bring units back to full working order for usually another 

RUNNYMEDE HOTEL

We can survey your existing equipment and from this produce a condition report with recommendations to bring units back to full working order for usually another

CONCORDE SIMULATOR

We can survey your existing equipment and from this produce a condition report with recommendations to bring units back to full working order for usually another

Send a Message

Quick Quote

Please complete the form with some basic details and we will get back to you with more information. Alternatively please give us a call on the number below or pop in for a chat.

Find us on LinkedIn & Facebook