CASE STUDY HIGHLIGHTS
COMPREHENSIVE ASSESSMENT
The survey encompassed a thorough examination of various components
Troubleshooting
Conducting research to identify any underlying problems or malfunctions in the AHUs.
Performance optimisation
Ensure everything is running efficiently & contributing to optimal overall performance.
Equipment Refurbishment
AHUs were found to be in reasonable condition and deemed suitable for refurbishment
Forest of Arden Case Study
The project involved the validation and surveying of the Air-Handling Unit (AHU) serving the swimming pool hall. The AHU, installed three years ago, was responsible for supplying and extracting air to maintain a temperature of approximately 31°C. However, the client reported that the maximum temperature achieved since the installation of the AHU was only around 21°C. The investigation covered various aspects of the installation, including air volumes, temperatures, ductwork layout, and air distribution system.
RELATED CASE STUDIES
SOUTHAMPTON UNIVERSITY
We can survey your existing equipment and from this produce a condition report with recommendations to bring units back to full working order for usually another
RUNNYMEDE HOTEL
We can survey your existing equipment and from this produce a condition report with recommendations to bring units back to full working order for usually another
CONCORDE SIMULATOR
We can survey your existing equipment and from this produce a condition report with recommendations to bring units back to full working order for usually another