CASE STUDY HIGHLIGHTS

b

COMPREHENSIVE ASSESSMENT

The survey encompassed a thorough examination of various components

p

Troubleshooting

Conducting research to identify any underlying problems or malfunctions in the AHUs.

Performance optimisation

Ensure everything is running efficiently & contributing to optimal overall performance.

Equipment Refurbishment

AHUs were found to be in reasonable condition and deemed suitable for refurbishment

Someone Changing The Filters In An Air-Handling Unit

FOREST OF ARDEN

The project involved the validation and surveying of the Air-Handling Unit (AHU) serving the swimming pool hall. The AHU, installed three years ago, was responsible for supplying and extracting air to maintain a temperature of approximately 31°C. However, the client reported that the maximum temperature achieved since the installation of the AHU was only around 21°C. The investigation covered various aspects of the installation, including air volumes, temperatures, ductwork layout, and air distribution system.

RELATED CASE STUDIES

DISNEY HEADQUARTERS

The project involved conducting a comprehensive survey and validation of the air-handling equipment (AHU) at Disney HQ in Hammersmith…

FRIARY MEADOW VILLAGE

Friary Meadow, a luxuriously appointed retirement development located near Fareham in Hampshire, provides residents with 86 properties…

CONCORDE SIMULATOR

At Brooklands, visitors can explore a full-size original ex-BA Concorde, allowing them to walk through and immerse themselves in its grandeur…

Send a Message

Quick Quote

Please complete the form with some basic details and we will get back to you with more information. Alternatively please give us a call on the number below or pop in for a chat.

Find us on LinkedIn & Facebook