CASE STUDY HIGHLIGHTS
COMPREHENSIVE ASSESSMENT
The survey encompassed a thorough examination of various components
Troubleshooting
Conducting research to identify any underlying problems or malfunctions in the AHUs.
Performance optimisation
Ensure everything is running efficiently & contributing to optimal overall performance.
Equipment Refurbishment
AHUs were found to be in reasonable condition and deemed suitable for refurbishment
FOREST OF ARDEN
The project involved the validation and surveying of the Air-Handling Unit (AHU) serving the swimming pool hall. The AHU, installed three years ago, was responsible for supplying and extracting air to maintain a temperature of approximately 31°C. However, the client reported that the maximum temperature achieved since the installation of the AHU was only around 21°C. The investigation covered various aspects of the installation, including air volumes, temperatures, ductwork layout, and air distribution system.
RELATED CASE STUDIES
DISNEY HEADQUARTERS
The project involved conducting a comprehensive survey and validation of the air-handling equipment (AHU) at Disney HQ in Hammersmith…
FRIARY MEADOW VILLAGE
Friary Meadow, a luxuriously appointed retirement development located near Fareham in Hampshire, provides residents with 86 properties…
CONCORDE SIMULATOR
At Brooklands, visitors can explore a full-size original ex-BA Concorde, allowing them to walk through and immerse themselves in its grandeur…