CASE STUDY HIGHLIGHTS

b

COMPREHENSIVE ASSESSMENT

The survey encompassed a thorough examination of various components

p

Troubleshooting

Conducting research to identify any underlying problems or malfunctions in the AHUs.

Performance optimisation

Ensure everything is running efficiently & contributing to optimal overall performance.

Equipment Refurbishment

AHUs were found to be in reasonable condition and deemed suitable for refurbishment

Someone Changing The Filters In An Air-Handling Unit

Red Distillery – AU Vodka

The project focused on the refurbishment of the ventilation system at RED Distillery, with a specific emphasis on the extract ventilation for the distillery area. The scope of work included the design and installation of a new extract system, spiral ductwork, fire dampers, and an extract fan. The system was designed to achieve 6 air changes per hour within the distillery area. The AHU refurbishment and installation of the ventilation system at RED Distillery aimed to enhance air quality and maintain optimal working conditions within the distillery area. The project encompassed design, installation, and commissioning, ensuring compliance with regulations and client requirements.

RELATED CASE STUDIES

DISNEY HEADQUARTERS

The project involved conducting a comprehensive survey and validation of the air-handling equipment (AHU) at Disney HQ in Hammersmith…

FRIARY MEADOW VILLAGE

Friary Meadow, a luxuriously appointed retirement development located near Fareham in Hampshire, provides residents with 86 properties…

CONCORDE SIMULATOR

At Brooklands, visitors can explore a full-size original ex-BA Concorde, allowing them to walk through and immerse themselves in its grandeur…

Send a Message

Quick Quote

Please complete the form with some basic details and we will get back to you with more information. Alternatively please give us a call on the number below or pop in for a chat.

Find us on LinkedIn & Facebook