CASE STUDY HIGHLIGHTS

b

COMPREHENSIVE ASSESSMENT

The survey encompassed a thorough examination of various components

p

Troubleshooting

Conducting research to identify any underlying problems or malfunctions in the AHUs.

Performance optimisation

Ensure everything is running efficiently & contributing to optimal overall performance.

Equipment Refurbishment

AHUs were found to be in reasonable condition and deemed suitable for refurbishment

Someone Changing The Filters In An Air-Handling Unit

Toca Football – 02 Arena

The Toca Project 02 Dome required refurbishment and repurposing to meet the specific needs of TOCA Social, the world’s first interactive football and dining experience. The existing Air-Handling Unit (AHU) did not meet the requirements, necessitating the repurposing of the AHU to accommodate the required air volume for the activity area and bar. he survey focused on AHU 1, 2, and 3, evaluating options for refurbishment and reinstating them to their original designs or reducing their duties while refurbishing. 

RELATED CASE STUDIES

DISNEY HEADQUARTERS

The project involved conducting a comprehensive survey and validation of the air-handling equipment (AHU) at Disney HQ in Hammersmith…

FRIARY MEADOW VILLAGE

Friary Meadow, a luxuriously appointed retirement development located near Fareham in Hampshire, provides residents with 86 properties…

CONCORDE SIMULATOR

At Brooklands, visitors can explore a full-size original ex-BA Concorde, allowing them to walk through and immerse themselves in its grandeur…

Send a Message

Quick Quote

Please complete the form with some basic details and we will get back to you with more information. Alternatively please give us a call on the number below or pop in for a chat.

Find us on LinkedIn & Facebook