CASE STUDY HIGHLIGHTS

b

COMPREHENSIVE ASSESSMENT

The survey encompassed a thorough examination of various components

p

Troubleshooting

Conducting research to identify any underlying problems or malfunctions in the AHUs.

Performance optimisation

Ensure everything is running efficiently & contributing to optimal overall performance.

Equipment Refurbishment

AHUs were found to be in reasonable condition and deemed suitable for refurbishment

Someone Changing The Filters In An Air-Handling Unit

Disney HQ – Hammersmith Case Study

The project involved conducting a comprehensive survey and validation of the air-handling equipment (AHU) at Disney HQ in Hammersmith. The building housed multiple rooms that required proper ventilation, and the survey focused on assessing the condition and performance of the nine different AHUs, which varied in age from approximately 20 to over 30 years old. These AHUs were located throughout the building, including on the rooftop and in various plant rooms.

RELATED CASE STUDIES

TOCA FOOTBALL – 02 ARENA

The Toca Project 02 Dome required refurbishment and repurposing to meet the specific needs of TOCA Social, the world’s first interactive football and dining…

AU VODKA – RED DISTILLERY

The project focused on the refurbishment of the ventilation system at RED Distillery, with a specific emphasis on the extract ventilation for the distillery area.

FOREST OF ARDEN – MARRIOT HOTEL

The project involved the validation and surveying of the Air-Handling Unit (AHU) serving the swimming pool hall. The AHU, installed three years ago, was responsible…

Send a Message

Quick Quote

Please complete the form with some basic details and we will get back to you with more information. Alternatively please give us a call on the number below or pop in for a chat.

Find us on LinkedIn & Facebook