When the temperature drops, every weakness in a building’s heating system is exposed. Cold classrooms, chilly wards, uncomfortable offices and complaints from tenants are usually the first sign that something in the plant room or air handling unit is not keeping up. Right now, as winter begins, heating is what keeps buildings open and occupants comfortable. At Building Ventilation Solutions we help facilities managers and estates teams across the UK diagnose and fix heating problems quickly, from commercial boilers and gas burners to the heating and frost coils inside air handling units.
Where winter heating problems usually start
Heat in a commercial building rarely comes from a single piece of equipment. A boiler or burner generates it, pipework and pumps move it, and in many buildings the air handling unit delivers it to the space through its heating coils. A fault anywhere in that chain can leave rooms cold. The most common winter problems we see include:
- Aging or poorly controlled boilers that struggle to hold temperature on the coldest days
- Gas burners in air handling units that no longer modulate properly, short cycling or failing to fire
- Frost and heating coils split by freezing, often discovered only when the system restarts
- Fouled or degraded coils that cannot transfer enough heat into the supply air
- Failed valves, actuators and sensors that stop heat reaching where it is needed
- Outdated controls that cannot respond to real demand
Frost damage: the hidden winter risk
Failed or incorrectly set freeze protection is the most common cause of AHU coil damage. When water inside a coil freezes it expands, splitting tubes or cracking headers. The damage often goes unnoticed until the unit is restarted, by which time the building is already cold. Buildings with reduced occupancy over the Christmas break, such as schools and offices, are particularly exposed. Our article on common winter risks for commercial buildings covers this in more detail.
When a coil does fail, a fast and accurate replacement is essential. At a car dealership in Farnborough, BVS surveyed and sized a fouled and degraded frost coil, manufactured a custom replacement, then installed, insulated, commissioned and tested it, restoring full heating capacity to the AHU. See the Farnborough car dealership coil replacement case study. At an office on Burlington Street in London, a severely damaged frost coil could not be brought into the plantroom in one piece, so we designed and manufactured the replacement in two sections without compromising performance. See the Burlington Street office coil replacement case study.
Burners and gas pipework
In many larger buildings, heat is delivered by gas fired burners inside rooftop air handling units. At Newton Mearns Shopping Centre in Glasgow, BVS refurbished three weatherproof rooftop AHUs that supply tempered air to the main mall. The old burners were replaced with fully modulating models meeting current gas safety standards and integrated into the existing Trend controls, and the corroded mild steel gas network was replaced with 316 grade stainless steel pipework. The works were phased so the centre stayed open throughout, with crane and scaffold work carried out outside normal trading hours. The refurbishment is projected to extend the life of the units by 10 to 15 years. See the Newton Mearns shopping centre AHU refurbishment case study.
Commercial boilers and plant rooms
The boiler is the engine of most heating systems, and winter is when an ageing one is most likely to let you down. BVS is Gas Safe registered and provides installation, servicing and emergency repair of commercial boilers, including condensing, cascade and modular systems, as well as water heaters, plate heat exchangers and heating pumps. Where we can, we aim to fix faults on the first visit. Where a boiler is coming to the end of its life, we can help you plan a replacement properly rather than waiting for it to fail.
Fix it now, plan the bigger work for later
Not every winter problem needs a major project. Often a targeted repair, a controls fix or a single coil replacement is enough to get a building warm again. But a winter breakdown is also a useful warning. If your heating has struggled this year, use what you have learned to plan larger works for a quieter period, such as a school holiday or a planned shutdown, rather than facing the same problem next winter. This is particularly important for schools and healthcare buildings, where major works need to be scheduled well in advance. We will be covering how to plan works around school holidays and clinical schedules in the coming weeks.
Get your heating back on track
If your building is struggling to stay warm, do not wait for a full breakdown. With over 40 years of experience, BVS diagnoses and repairs heating problems across all makes and models of boilers, burners and air handling units, and we aim to respond to every enquiry within 24 hours. Contact the BVS team on 01256 518170 to arrange a site visit, or explore our commercial boiler and heating services and AHU coil replacement services to find out more.