CASE STUDY HIGHLIGHTS
Custom AHU DESIGN
Based on the gathered measurements and requirements, our engineering team proceeded to design the custom AHUs
AHU Manufacturing
These AHUs were meticulously engineered to meet the exact specifications outlined.
AHU Installation
We developed a detailed installation plan to ensure minimal disruption to the construction activities at Dorset Rise.
Ductwork Integration
Following the successful installation, our team seamlessly integrated the newly installed AHUs into the existing ductwork.
Blackfriars Office Bloom Development – Case Study
Situated in the heart of London, Dorset Rise, a newly constructed office block got in contact with us to assist them in designing, manufacturing, and installing two cutting-edge Air-Handling Units (AHUs) tailored specifically to meet the unique demands of this prestigious office space.This project demanded meticulous planning that spanned several months, with each phase carefully orchestrated to mitigate the risk of any errors or setbacks.
RELATED CASE STUDIES
TOCA FOOTBALL – 02 ARENA
The Toca Project 02 Dome required refurbishment and repurposing to meet the specific needs of TOCA Social, the world’s first interactive football and dining…
AU VODKA – RED DISTILLERY
The project focused on the refurbishment of the ventilation system at RED Distillery, with a specific emphasis on the extract ventilation for the distillery area.
FOREST OF ARDEN – MARRIOT HOTEL
The project involved the validation and surveying of the Air-Handling Unit (AHU) serving the swimming pool hall. The AHU, installed three years ago, was responsible…